Solid-State Transformer Solutions · Hong Kong

The transformer,
redefined in silicon.

JINGCORE designs and delivers solid-state transformer (SST) solutions for the loads that are outgrowing conventional transformers — AI data centers, fast-charging hubs, renewable plants and modern microgrids. One unit connects medium-voltage AC directly to the AC and DC buses your facility actually runs on.

Solid-state transformer cabinet installed in a data center

SST cabinet in a data hall — concept rendering.

BidirectionalPower flows both ways — generation, storage and grid services in one asset.
Native DC portsMV AC in, regulated DC out. Fewer conversion stages between grid and load.
Software-definedVoltage, power flow and protection are controlled in software, and monitored remotely.
SiC-basedBuilt on silicon-carbide power devices — compact, efficient, and designed for partial-load efficiency.

Why solid-state, why now

A conventional transformer does one thing well: it changes voltage, passively, in one direction. New loads — GPU halls, megawatt charging, rooftop-to-grid renewables — need conversion, control and DC interfaces that a passive transformer cannot provide. An SST replaces the transformer plus several downstream converters with a single controllable unit.

Conventional transformerSolid-state transformer
Power flowOne direction, fixed ratioBidirectional, actively controlled
InterfacesAC in, AC outMV AC, LV AC and DC ports (incl. 400 V / 800 V DC classes)
Power qualityPasses disturbances throughRegulates voltage, compensates harmonics and reactive power
Footprint & weightOil-filled, heavy, largeA fraction of the size and weight; no oil, simpler siting and fire case
VisibilityNone — a silent assetMetered, alarmed and remotely monitored by design
Grid servicesNoneCan support grid-forming and fast frequency response functions
Typical project configurations we engineer around: 10 kV / 35 kV medium-voltage input; low-voltage AC and DC outputs; unit ratings from hundreds of kVA upward, paralleled to multi-MVA installations. Every project is specified against the site's load profile and local grid code — talk to us before assuming a catalogue model.

Solutions

Four load types are driving SST adoption first. These are the projects we take on.

01Data Centers

Medium-voltage AC in, clean DC to the hall. An SST front-end removes conversion stages between the utility feed and the rack bus, cuts electrical-room footprint, and gives operators a single monitored asset at the grid interface — sized for AI-era load density and staged expansion.

EV fast-charging hub

Concept rendering

02EV Charging Hubs

Connect a charging park straight to the MV network without a conventional substation build-out. Native DC output feeds high-power chargers directly, with dynamic load management across stalls and headroom for on-site storage and solar.

Solar farm with battery storage

Concept rendering

03Renewables & Storage

One bidirectional interface for PV, wind and battery storage. The SST handles grid connection, power-quality compliance and export control in a single unit — a practical building block for plants that must meet tightening grid codes.

Automated factory electrical room

Concept rendering

04Industrial Microgrids

For factories, ports and campuses that run their own networks: regulated voltage for sensitive processes, seamless islanding with storage, and a controllable boundary with the utility grid.

How we work

We are a solutions house, not a catalogue reseller. JINGCORE engineers and integrates; vetted manufacturing partners build and warrant the hardware.

STEP 1
Load & site studyYour load profile, grid connection point and expansion plan define the specification.
STEP 2
Solution designTopology, ratings, protection and grid-code compliance — documented before any hardware is ordered.
STEP 3
Manufacture & FATBuilt by our OEM partners; factory acceptance testing witnessed and reported.
STEP 4
Delivery & commissioningExport logistics from Hong Kong, installation supervision and on-site commissioning support.
STEP 5
Warranty & serviceOEM-backed warranty, coordinated through JINGCORE for the life of the installation.
Contracting: projects are contracted and settled through JINGCORE INTELLIGENT LIMITED in Hong Kong, in USD or HKD. Warranty obligations sit with the manufacturer and are passed through in the project contract — in writing, before you commit.

Standards & export readiness

Equipment is specified and verified against the standards of the destination market — confirmed in writing, per project, before contract.

SafetyIEC 62477 basis

Design and acceptance reference IEC 62477 safety requirements for power electronic converter systems, with type-test documentation reviewed at FAT.

EMCIEC 61000 series

Electromagnetic compatibility is specified to the IEC 61000 family and the destination utility's connection requirements.

Grid fit11 kV / 33 kV · 50 / 60 Hz

Configurations are engineered for Middle East networks — 11 kV and 33 kV connection points, 50 Hz or 60 Hz — and checked against the local grid code at design stage.

CertificationVerified per project

CE / UL status differs by manufacturer and model. We verify the actual certificates for the exact unit proposed — no assumptions, no catalogue claims — and put the result in the project file.

About JINGCORE

JINGCORE INTELLIGENT LIMITED is a Hong Kong company working across the electronics and energy value chain. Our main business — electronic component sourcing and supply-chain services — operates at jingcoretech.com.

SST Solutions is our dedicated energy practice. We come to solid-state transformers from the device level up: our team works with silicon-carbide power semiconductors — the devices that make SSTs possible — as well as the systems they go into. That device-to-system view is what we bring to specification, sourcing and acceptance on every project.

Straight answers

  • SST is a young technology. We will tell you plainly where it fits your project — and where a conventional transformer is still the right answer.
  • No catalogue fiction: configurations are engineered per project and confirmed in writing before contract.
  • Certification and grid-code requirements are scoped with you at design stage, not discovered at delivery.
  • First step is a conversation about your load — not a quotation for a box.

Industry news

Solid-state transformers are moving from laboratories to live projects. We track the field as it develops — headlines below are from the original sources.

20 Nov 2026 · Product launch

Jereh launches PowerVEGA SST for AI data centers at RE+ 2026

A 3 MW solid-state transformer with 13.8 kV AC input, 800 V DC output and 98.5% peak efficiency, designed for direct coupling with on-site generation.

Source: PR Newswire ↗

6 Nov 2026 · Grid demonstration

Shenzhen builds its first “SST + mobile storage” demonstration zone

Shenzhen Power Supply Bureau commissioned a 2.5 MW full-SiC SST converting 10 kV AC to 800 V DC and 380 V AC at 98% efficiency — with a footprint about 40% smaller than a conventional unit.

Source: China Southern Power Grid News via CPEM ↗

28 Oct 2026 · Project commissioning

Jiangsu's first computing–electricity synergy SST project goes live

NR Electric's PCS-9538 SST anchors a Changzhou platform linking PV, storage, ultra-fast charging and AI computing loads on an 800 V DC bus.

Source: NR Electric ↗

13 Oct 2026 · Product launch

DG Matrix unveils Interport 360 SST for AI factories

Modular, SiC-based SST cells built on NVIDIA's MGX architecture deliver native 800 VDC to modular data centers, scaling skid by skid.

Source: Business Wire ↗

18 Aug 2026 · Field test

Megawatt-class SST validated on a live utility feeder

NC State, NYPA and EPRI ran a 1 MW solid-state transformer on a working distribution feeder — the first independently verified test of its kind, at roughly 98% efficiency.

Source: Magica / NC State ↗

30 Apr 2026 · Product announcement

Enphase unveils distributed SST for AI data centers

A modular 1.25 MW IQ SST converting MV AC directly to 800 V DC in a single stage; customer pilots are planned for 2027 and volume shipments for 2028.

Source: pv magazine ↗

Tell us about your load

Send us the basics — site location, connection voltage, load size and what you are building — and we will come back with whether an SST belongs in the design, and what it would take. No obligation, no catalogue spam.

ContactSteven — JINGCORE SST Solutions
Emailsteven@jingcoretech.com
OfficeRoom B, Unit D2, 20/F, TML Tower, 3 Hoi Shing Road, Tsuen Wan, New Territories, Hong Kong